Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                17493
BR                                17493                             VN                                8410
VN                                8410                             US                                2621
US                                2621                             CN                                1757
CN                                1757                             AR                                1620
AR                                1620                             MY                                1092
MY                                1092                             SG                                812
SG                                812                             EC                                760
EC                                760                             
         
        
 
        