Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                24908
BR                                24908                             VN                                13603
VN                                13603                             AR                                3771
AR                                3771                             US                                3086
US                                3086                             CN                                1809
CN                                1809                             EC                                1519
EC                                1519                             RU                                1031
RU                                1031                             BD                                929
BD                                929                             
         
        
 
        