Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                22691
BR                                22691                             VN                                11178
VN                                11178                             US                                4202
US                                4202                             AR                                2209
AR                                2209                             CN                                1510
CN                                1510                             IN                                1336
IN                                1336                             MY                                1085
MY                                1085                             EC                                977
EC                                977                             
         
        