Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                27636
BR                                27636                             VN                                12283
VN                                12283                             US                                2883
US                                2883                             AR                                2670
AR                                2670                             CN                                1562
CN                                1562                             EC                                1184
EC                                1184                             MY                                879
MY                                879                             CO                                704
CO                                704                             
         
        