Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                34904
BR                                34904                             US                                14363
US                                14363                             VN                                7372
VN                                7372                             GB                                3197
GB                                3197                             MX                                3108
MX                                3108                             AR                                2964
AR                                2964                             CO                                1816
CO                                1816                             CN                                1690
CN                                1690                             
         
        