Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                31609
BR                                31609                             VN                                10678
VN                                10678                             US                                7515
US                                7515                             AR                                2974
AR                                2974                             EC                                1433
EC                                1433                             CN                                1406
CN                                1406                             IN                                1034
IN                                1034                             MY                                961
MY                                961                             
         
        