Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                19349
BR                                19349                             VN                                9513
VN                                9513                             US                                3173
US                                3173                             CN                                1772
CN                                1772                             AR                                1759
AR                                1759                             MY                                1033
MY                                1033                             SG                                916
SG                                916                             EC                                845
EC                                845                             
         
        