Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                30809
BR                                30809                             VN                                13493
VN                                13493                             AR                                2963
AR                                2963                             US                                2669
US                                2669                             EC                                1401
EC                                1401                             MY                                1331
MY                                1331                             CN                                1304
CN                                1304                             SG                                838
SG                                838                             
         
        