Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                22147
BR                                22147                             VN                                11350
VN                                11350                             US                                2380
US                                2380                             AR                                2159
AR                                2159                             CN                                1697
CN                                1697                             EC                                1024
EC                                1024                             MY                                1007
MY                                1007                             SG                                838
SG                                838                             
         
        