Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                17195
BR                                17195                             VN                                8914
VN                                8914                             US                                2947
US                                2947                             CN                                1855
CN                                1855                             AR                                1624
AR                                1624                             MY                                773
MY                                773                             SG                                765
SG                                765                             EC                                718
EC                                718                             
         
        
 
        