Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                36231
BR                                36231                             VN                                11821
VN                                11821                             US                                10026
US                                10026                             IN                                4934
IN                                4934                             AR                                3293
AR                                3293                             GB                                1973
GB                                1973                             MY                                1692
MY                                1692                             EC                                1557
EC                                1557                             
         
        