Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                36458
BR                                36458                             VN                                16350
VN                                16350                             AR                                3457
AR                                3457                             US                                2831
US                                2831                             CN                                1702
CN                                1702                             EC                                1644
EC                                1644                             BD                                978
BD                                978                             RU                                847
RU                                847                             
         
        