Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                30620
BR                                30620                             VN                                13395
VN                                13395                             AR                                2945
AR                                2945                             US                                2652
US                                2652                             EC                                1388
EC                                1388                             MY                                1335
MY                                1335                             CN                                1298
CN                                1298                             SG                                834
SG                                834                             
         
        
 
        