Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                15588
BR                                15588                             VN                                6298
VN                                6298                             US                                3641
US                                3641                             MY                                1611
MY                                1611                             AR                                1509
AR                                1509                             CN                                1288
CN                                1288                             EC                                659
EC                                659                             SG                                527
SG                                527                             
         
        