Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                14758
BR                                14758                             VN                                6702
VN                                6702                             US                                2425
US                                2425                             CN                                1701
CN                                1701                             AR                                1451
AR                                1451                             MY                                1247
MY                                1247                             EC                                722
EC                                722                             SG                                655
SG                                655                             
         
        