Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                20290
BR                                20290                             VN                                8140
VN                                8140                             US                                8024
US                                8024                             MY                                2644
MY                                2644                             AR                                2634
AR                                2634                             MX                                1711
MX                                1711                             GB                                1664
GB                                1664                             CN                                1276
CN                                1276                             
         
        
 
        