Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                34299
BR                                34299                             VN                                10376
VN                                10376                             US                                9324
US                                9324                             AR                                3070
AR                                3070                             GB                                1561
GB                                1561                             EC                                1492
EC                                1492                             MX                                1445
MX                                1445                             CN                                1320
CN                                1320                             
         
        
 
        