Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                19264
BR                                19264                             VN                                8197
VN                                8197                             US                                2596
US                                2596                             AR                                1768
AR                                1768                             CN                                1764
CN                                1764                             MY                                1161
MY                                1161                             EC                                889
EC                                889                             SG                                653
SG                                653                             
         
        