Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                19386
BR                                19386                             VN                                7984
VN                                7984                             US                                2466
US                                2466                             AR                                1810
AR                                1810                             CN                                1797
CN                                1797                             MY                                1031
MY                                1031                             EC                                929
EC                                929                             SG                                909
SG                                909                             
         
        