Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                36720
BR                                36720                             VN                                17160
VN                                17160                             US                                3745
US                                3745                             AR                                3516
AR                                3516                             CN                                1630
CN                                1630                             EC                                1604
EC                                1604                             BD                                1030
BD                                1030                             RU                                867
RU                                867                             
         
        