Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                36542
BR                                36542                             VN                                16321
VN                                16321                             AR                                3472
AR                                3472                             US                                2899
US                                2899                             CN                                1709
CN                                1709                             EC                                1662
EC                                1662                             BD                                975
BD                                975                             RU                                852
RU                                852                             
         
        