Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Waktu
Pejabat
Isnin - Jumaat 9:00 AM - 5:30 PM
Sabtu 9:00 AM - 1:00 PM
Ahad Closed
We′re closed on Public Holiday
Open Closed
SSM
PENGUNJUNG

24-Mar-2026

Smoke Control System Commissioning by EKG M&E Sdn Bhd

In the high-rise commercial landscape of KL and PJ, the commissioning of a smoke control system is the most critical step before a building can be occupied. EKG M&E Sdn Bhd specializes in Smoke Control System Commissioning (T&C), providing the technical validation and documentation required for BOMBA (Fire and Rescue Department of Malaysia) approval and the issuance of your Fire Certificate (FC).


The Commissioning Framework: Proving Life Safety

Commissioning is not just a "functional check"; it is a rigorous stress test of the building's mechanical "lungs." We follow a structured protocol to ensure every component survives the extreme conditions of a fire.

1. Mechanical Component Verification

We verify that the physical hardware matches the engineered design and survives thermal stress.

  • High-Temperature Fan Testing: We run Smoke Spill and Pressurization Fans at 100% capacity. We measure current (Amps), voltage, and vibration to ensure Class H motors are ready to run at 250°C for 2 hours.

  • Damper Integrity: We cycle every Motorized Fire and Smoke Damper. We verify that they close (to isolate zones) or open (to extract smoke) within the mandatory 60 seconds.

2. Airflow and Pressure Mapping

We use calibrated instruments to prove the "Pressure Shield" is effective.

  • Differential Pressure (DP) Testing: We measure stairwell pressure to ensure it maintains 50 Pa relative to the floor. We also check Lift Lobby Pressurization (typically 15 Pa) to ensure smoke cannot enter escape routes.

  • Door Opening Force: We use digital force gauges to ensure that under full pressurization, the force required to open an exit door does not exceed 110 N, allowing for safe evacuation of all occupants.

  • Extraction Rate (10 ACH): Using anemometers, we calculate the total exhaust volume to confirm the system meets the mandatory 10 Air Changes Per Hour for smoke spill.

3. Control Logic and Integration (The "Fire Mode")

We simulate an alarm to test the communication between the Main Fire Alarm Panel (MFAP) and the ventilation system.

  • HVAC Shutdown Interlock: We confirm that when the fire alarm triggers, all general office AC units shut down instantly to prevent the mechanical mixing of smoke.

  • VFD Override: We verify that Variable Frequency Drives (VFDs) enter "Fire Mode," bypassing all energy-saving and motor protection limits to prioritize operation over equipment longevity.

4. Hot Smoke Visualization (The Final Proof)

For complex atria or lobbies, we perform a Hot Smoke Test. By using non-toxic, heated smoke, we provide visual proof of the "Smoke Plume" behavior and the stability of the "Clear Layer."


Commissioning Compliance Checklist

Test Phase BOMBA / UBBL Requirement EKG M&E Standard
Response Time Full activation < 60 seconds. High-speed actuator sync.
Stairwell Pressure Minimum 50 Pa. Calibrated 50-55 Pa.
Smoke Spill Rate 10 ACH minimum. Certified Duct Traverse Test.
Power Supply Essential/Genset backed. Verified via ATS Load Test.

Why Choose EKG M&E Sdn Bhd?

  • HVAC & Clean Air Specialist: We provide the comprehensive Testing & Commissioning (T&C) Report and the necessary Form G/F certifications required for your annual Fire Certificate audit.

  • Rectification Support: If a system fails commissioning (e.g., a leaking duct or a sluggish actuator), our M&E team can perform immediate repairs on-site to keep your project on schedule.

  • Klang Valley Strategic Support: Based in Kuala Lumpur, we provide professional commissioning and annual re-validation for Grade-A towers, malls, and industrial sites across the Klang Valley.

Hantar mesej anda ke EKG M & E SDN BHD
Terima kasih untuk pertanyaan anda!
Perkhidmatan pelanggan kami akan menghubungi anda tidak lama lagi.
Nama Anda *
Nama Syarikat Anda
Emel Anda *
Nombor Telefon Anda *
Tajuk *
Mesej *
Captcha *
Pejabat Utama

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Emel:
Laman Web: https://www.eakon.com.my
Laman Web: https://eakon.newpages.com.my/
Laman Web: https://eakon.onesync.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us