请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

24-Mar-2026

Smoke Control System Commissioning by EKG M&E Sdn Bhd

In the high-rise commercial landscape of KL and PJ, the commissioning of a smoke control system is the most critical step before a building can be occupied. EKG M&E Sdn Bhd specializes in Smoke Control System Commissioning (T&C), providing the technical validation and documentation required for BOMBA (Fire and Rescue Department of Malaysia) approval and the issuance of your Fire Certificate (FC).


The Commissioning Framework: Proving Life Safety

Commissioning is not just a "functional check"; it is a rigorous stress test of the building's mechanical "lungs." We follow a structured protocol to ensure every component survives the extreme conditions of a fire.

1. Mechanical Component Verification

We verify that the physical hardware matches the engineered design and survives thermal stress.

  • High-Temperature Fan Testing: We run Smoke Spill and Pressurization Fans at 100% capacity. We measure current (Amps), voltage, and vibration to ensure Class H motors are ready to run at 250°C for 2 hours.

  • Damper Integrity: We cycle every Motorized Fire and Smoke Damper. We verify that they close (to isolate zones) or open (to extract smoke) within the mandatory 60 seconds.

2. Airflow and Pressure Mapping

We use calibrated instruments to prove the "Pressure Shield" is effective.

  • Differential Pressure (DP) Testing: We measure stairwell pressure to ensure it maintains 50 Pa relative to the floor. We also check Lift Lobby Pressurization (typically 15 Pa) to ensure smoke cannot enter escape routes.

  • Door Opening Force: We use digital force gauges to ensure that under full pressurization, the force required to open an exit door does not exceed 110 N, allowing for safe evacuation of all occupants.

  • Extraction Rate (10 ACH): Using anemometers, we calculate the total exhaust volume to confirm the system meets the mandatory 10 Air Changes Per Hour for smoke spill.

3. Control Logic and Integration (The "Fire Mode")

We simulate an alarm to test the communication between the Main Fire Alarm Panel (MFAP) and the ventilation system.

  • HVAC Shutdown Interlock: We confirm that when the fire alarm triggers, all general office AC units shut down instantly to prevent the mechanical mixing of smoke.

  • VFD Override: We verify that Variable Frequency Drives (VFDs) enter "Fire Mode," bypassing all energy-saving and motor protection limits to prioritize operation over equipment longevity.

4. Hot Smoke Visualization (The Final Proof)

For complex atria or lobbies, we perform a Hot Smoke Test. By using non-toxic, heated smoke, we provide visual proof of the "Smoke Plume" behavior and the stability of the "Clear Layer."


Commissioning Compliance Checklist

Test Phase BOMBA / UBBL Requirement EKG M&E Standard
Response Time Full activation < 60 seconds. High-speed actuator sync.
Stairwell Pressure Minimum 50 Pa. Calibrated 50-55 Pa.
Smoke Spill Rate 10 ACH minimum. Certified Duct Traverse Test.
Power Supply Essential/Genset backed. Verified via ATS Load Test.

Why Choose EKG M&E Sdn Bhd?

  • HVAC & Clean Air Specialist: We provide the comprehensive Testing & Commissioning (T&C) Report and the necessary Form G/F certifications required for your annual Fire Certificate audit.

  • Rectification Support: If a system fails commissioning (e.g., a leaking duct or a sluggish actuator), our M&E team can perform immediate repairs on-site to keep your project on schedule.

  • Klang Valley Strategic Support: Based in Kuala Lumpur, we provide professional commissioning and annual re-validation for Grade-A towers, malls, and industrial sites across the Klang Valley.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us