请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Yao Mu Realty Sdn Bhd
Yao Mu Realty Sdn Bhd 202301018134 (1512056-A)
营业
时间
星期一 - 星期日 9:00 AM - 10:00 PM
营业 休息
SSM

CIDB Launches Full Investigation into ECRL Temporary Structure Collapse on MRR2

25-Nov-2025

The Construction Industry Development Board (CIDB) has initiated a detailed investigation into the collapse of a temporary steel canopy at the East Coast Rail Link (ECRL) construction site along the MRR2 highway near Batu Caves. The incident, which occurred on Tuesday afternoon, has raised public concern after debris from the structure crushed a motorist’s vehicle. The woman escaped with the help of bystanders before emergency teams arrived.


Investigation Triggered Under Act 520

Works Minister Datuk Seri Alexander Nanta Linggi confirmed that CIDB is probing the incident under Section 34C of the Malaysian Construction Industry Development Act (Act 520). The investigation aims to determine whether any breaches of safety compliance or construction standards contributed to the collapse.

Although the ECRL project does not fall directly under the Works Ministry, Nanta emphasised that CIDB has the authority to act.

“CIDB has begun a detailed investigation, and we have instructed the project developer, Malaysia Rail Link Sdn Bhd (MRL), to stop all construction activities in the affected zone immediately,” he said during a press conference in Shah Alam.

The stop-work order took effect Nov 19, pending assessment of the incident’s root cause and confirmation that all required safety protocols are in place.


Incident Occurred on Busy Public Road

Given that the collapse happened on a major public route, Nanta stressed that ensuring safety for road users is the top priority.

He noted that a thorough investigation is necessary:

“This incident occurred on a public road and has understandably caused public concern. CIDB must take decisive action and ensure the project is halted until safety is fully assured.”

The temporary canopy collapse happened around 2pm, and video clips circulating online showed the severity of the accident. Fortunately, no fatalities were reported.


Broader Context for the Construction Industry

The incident also puts a spotlight on Malaysia’s ongoing infrastructure and development boom, particularly around key corridors like Kuala Lumpur and Selangor. These areas are simultaneously seeing significant demand for:

  • Commercial property in KL, driven by transit projects and central business activity

  • Industrial land in Selangor, especially for logistics, warehousing and data centre developments

  • Factory expansion in Puchong, a growing industrial hub

  • Office space in Bukit Jalil, supported by major mixed-use developments

  • Industrial property in the Subang area, which remains a preferred location for engineering and manufacturing firms

With construction activity intensifying in Greater KL, compliance, safety audits and enforcement by CIDB and related agencies have become increasingly critical to prevent similar incidents.

总办事处

Yao Mu Realty Sdn Bhd 202301018134 (1512056-A)
Unit 15-3,The Link 2, Jalan Jalil Perkasa 3, 57000 Bukit Jalil, Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.yaomurealty.com
网址: https://yaomurealty.newpages.com.my/
网址: https://yaomurealty.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • BR 12090
  • VN 4843
  • US 3179
  • MY 3123
  • AR 2003
  • SG 1705
  • IN 1626
  • IQ 1608
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us