Scope :
-
Pre-Audit Review and Site Walkthrough
-
Collect system design documents, drawings, load profiles, and operating schedules
-
Conduct a site walkthrough to inspect chillers, pumps, cooling towers, AHUs, and control systems
-
Interview operations and maintenance staff
-
-
Data Collection and Instrumentation Setup
-
Install temporary energy meters (power analyzers) on:
-
Chillers (main compressors)
-
Condenser water pumps
-
Chilled water pumps
-
Cooling tower fans
-
-
Log data for power (kW), voltage, current, and power factor
-
Install flow meters and temperature sensors on chilled and condenser water loops
-
-
Real-Time Performance Measurement
-
Record actual cooling load (RT), chilled water flow, inlet/outlet temperatures
-
Measure and log system kW usage during normal, peak, and partial load conditions
-
Monitor equipment cycling, setpoint accuracy, and control sequences
-
-
kW/RT Calculation and Benchmarking
-
Compare results against local and international benchmarks (e.g., <0.8 kW/RT for efficient systems)
-
Identify deviations, inefficiencies, and abnormal operation patterns
-
-
System Efficiency Analysis
-
Evaluate individual equipment efficiency:
-
Chiller performance (COP, partial-load behavior)
-
Pump and fan energy consumption
-
Cooling tower approach temperature
-
-
Assess control system logic and automation effectiveness (e.g., BMS, VSD operation, staging)
-
-
Improvement Recommendations
-
Identify retrofit opportunities (e.g., VSDs, high-efficiency chillers, control upgrades)
-
Suggest operational improvements (e.g., setpoint tuning, load balancing, better scheduling)
-
Estimate energy savings, payback periods, and potential carbon reduction
-
-
Reporting and Presentation
-
Deliver a detailed audit report including:
-
Current kW/RT performance
-
Energy usage breakdown
-
Graphs, charts, and logged data
-
List of proposed improvements with ROI estimates
-
-