请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN. BHD.
EKG M & E SDN. BHD. 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

31-Dec-2025

Installing Water Cooled Packaged Units (WCPU) in high-rise commercial buildings requires careful planning, precise coordination, and adherence to building codes to ensure safe, efficient, and long-term performance in offices, hotels, retail podiums, and mixed-use towers.

Step-by-Step Installation Overview for High-Rise WCPU Systems:

  1. Pre-Installation Planning & Coordination
    • Review structural floor loading capacity for unit weight (typically 800–2,500 lbs per floor).
    • Confirm condenser water riser locations, sizes, and pressure ratings with mechanical engineer.
    • Coordinate with architect for mechanical room/closet dimensions, access doors, and service clearances.
    • Secure required permits, fire-stopping approvals, and seismic bracing requirements per local codes.
  2. Condenser Water Loop Preparation
    • Install and pressure-test vertical supply/return risers before unit delivery.
    • Flush and chemically treat the entire condenser water loop to remove debris and prevent initial scaling.
    • Install isolation valves, strainers, flow control devices, and balancing valves at each floor takeoff.
    • Verify water quality meets manufacturer specifications (pH, hardness, treatment program).
  3. Unit Delivery & Placement
    • Use freight elevators or hoisting equipment for safe transport to designated floors.
    • Position WCPU on vibration isolators or spring mounts to minimize structure-borne noise.
    • Ensure minimum service clearances (typically 36–48 inches) around access panels and controls.
  4. Piping & Connections
    • Connect condenser water inlet/outlet with flexible connections or expansion loops to accommodate building movement.
    • Install shut-off valves, Y-strainers, and flow switches on both supply and return lines.
    • Pressure-test piping connections before charging the loop.
    • Properly slope condensate drain lines with trap and vent to building drainage system.
  5. Electrical & Controls Integration
    • Provide dedicated power supply per unit nameplate (usually 208-230V/3Ø or 460V/3Ø).
    • Wire to BMS/central controls for remote monitoring, scheduling, and demand limiting.
    • Install interlocks with fire alarm and smoke control systems as required.
  6. Startup & Commissioning
    • Fill and vent the condenser water loop; bleed air at high points.
    • Check water flow rates and adjust balancing valves to meet design GPM.
    • Perform functional testing: cooling mode, safety controls, high/low-pressure cutouts.
    • Verify leaving water temperature, refrigerant pressures, and airflow across coils.
    • Train building staff on basic operation, filter changes, and alarm response.

Pro Tips for Successful High-Rise WCPU Installation:

  • Schedule installation during low-occupancy periods to minimize disruption.
  • Use modular, floor-by-floor approach for phased tenant fit-outs.
  • Document all as-built conditions, test reports, and water treatment records for warranty and maintenance.
  • Engage factory-trained technicians for final startup to protect equipment warranty.

Proper installation of Water Cooled Packaged Units in high-rise buildings ensures reliable cooling, excellent energy efficiency, independent floor control, and minimal future service headaches — delivering long-term value for developers, owners, and tenants in today’s vertical commercial landscape.

发信息至 EKG M & E SDN. BHD.
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN. BHD. 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.ekg.com.my
网址: https://ekg.newpages.com.my/
网址: https://ekg.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us