Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN. BHD.
EKG M & E SDN. BHD. 201201033712 (1018200-D)
Waktu
Pejabat
Isnin - Jumaat 9:00 AM - 5:30 PM
Sabtu 9:00 AM - 1:00 PM
Ahad Closed
We′re closed on Public Holiday
Open Closed
SSM
PENGUNJUNG

31-Dec-2025

Installing Water Cooled Packaged Units (WCPU) in high-rise commercial buildings requires careful planning, precise coordination, and adherence to building codes to ensure safe, efficient, and long-term performance in offices, hotels, retail podiums, and mixed-use towers.

Step-by-Step Installation Overview for High-Rise WCPU Systems:

  1. Pre-Installation Planning & Coordination
    • Review structural floor loading capacity for unit weight (typically 800–2,500 lbs per floor).
    • Confirm condenser water riser locations, sizes, and pressure ratings with mechanical engineer.
    • Coordinate with architect for mechanical room/closet dimensions, access doors, and service clearances.
    • Secure required permits, fire-stopping approvals, and seismic bracing requirements per local codes.
  2. Condenser Water Loop Preparation
    • Install and pressure-test vertical supply/return risers before unit delivery.
    • Flush and chemically treat the entire condenser water loop to remove debris and prevent initial scaling.
    • Install isolation valves, strainers, flow control devices, and balancing valves at each floor takeoff.
    • Verify water quality meets manufacturer specifications (pH, hardness, treatment program).
  3. Unit Delivery & Placement
    • Use freight elevators or hoisting equipment for safe transport to designated floors.
    • Position WCPU on vibration isolators or spring mounts to minimize structure-borne noise.
    • Ensure minimum service clearances (typically 36–48 inches) around access panels and controls.
  4. Piping & Connections
    • Connect condenser water inlet/outlet with flexible connections or expansion loops to accommodate building movement.
    • Install shut-off valves, Y-strainers, and flow switches on both supply and return lines.
    • Pressure-test piping connections before charging the loop.
    • Properly slope condensate drain lines with trap and vent to building drainage system.
  5. Electrical & Controls Integration
    • Provide dedicated power supply per unit nameplate (usually 208-230V/3Ø or 460V/3Ø).
    • Wire to BMS/central controls for remote monitoring, scheduling, and demand limiting.
    • Install interlocks with fire alarm and smoke control systems as required.
  6. Startup & Commissioning
    • Fill and vent the condenser water loop; bleed air at high points.
    • Check water flow rates and adjust balancing valves to meet design GPM.
    • Perform functional testing: cooling mode, safety controls, high/low-pressure cutouts.
    • Verify leaving water temperature, refrigerant pressures, and airflow across coils.
    • Train building staff on basic operation, filter changes, and alarm response.

Pro Tips for Successful High-Rise WCPU Installation:

  • Schedule installation during low-occupancy periods to minimize disruption.
  • Use modular, floor-by-floor approach for phased tenant fit-outs.
  • Document all as-built conditions, test reports, and water treatment records for warranty and maintenance.
  • Engage factory-trained technicians for final startup to protect equipment warranty.

Proper installation of Water Cooled Packaged Units in high-rise buildings ensures reliable cooling, excellent energy efficiency, independent floor control, and minimal future service headaches — delivering long-term value for developers, owners, and tenants in today’s vertical commercial landscape.

Hantar mesej anda ke EKG M & E SDN. BHD.
Terima kasih untuk pertanyaan anda!
Perkhidmatan pelanggan kami akan menghubungi anda tidak lama lagi.
Nama Anda *
Nama Syarikat Anda
Emel Anda *
Nombor Telefon Anda *
Tajuk *
Mesej *
Captcha *
Pejabat Utama

EKG M & E SDN. BHD. 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Emel:
Laman Web: https://www.ekg.com.my
Laman Web: https://ekg.newpages.com.my/
Laman Web: https://ekg.onesync.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us