Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                29245
BR                                29245                             VN                                19037
VN                                19037                             AR                                4261
AR                                4261                             US                                3788
US                                3788                             CN                                1826
CN                                1826                             EC                                1702
EC                                1702                             BD                                1111
BD                                1111                             RU                                1099
RU                                1099                             
         
        
 
        