Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                24009
BR                                24009                             VN                                11186
VN                                11186                             US                                6119
US                                6119                             MY                                4060
MY                                4060                             AR                                3246
AR                                3246                             MX                                1455
MX                                1455                             CN                                1377
CN                                1377                             EC                                1347
EC                                1347                             
         
        
 
        