Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                38736
BR                                38736                             VN                                12665
VN                                12665                             US                                4441
US                                4441                             AR                                3353
AR                                3353                             MY                                3120
MY                                3120                             EC                                1618
EC                                1618                             CN                                1369
CN                                1369                             MX                                1136
MX                                1136                             
         
        
 
        