请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

27-Mar-2026

Emergency Power Changeover Testing (ATS) | Pressurization Fan Maintenance by EKG

In a fire emergency, your building’s life-safety fans—Staircase Pressurization and Smoke Spill—are only as reliable as their power source. The Automatic Transfer Switch (ATS) is the critical link that detects a utility power failure and "swaps" the fan’s load to the Emergency Generator. In Kuala Lumpur’s high-rise environment, a "lazy" or "stuck" ATS can leave your escape routes filled with smoke even if the fans themselves are in perfect mechanical condition.

As part of a Ventilation Systems Audit, EKG performs rigorous Emergency Power Changeover Testing to ensure your fans bridge the gap between TNB failure and Generator startup without tripping their motor protection.


1. The "Moment of Truth": The 10-Second Window

When the main power drops, there is a critical sequence that must occur:

  • The Voltage Drop Detection: The ATS must sense the loss of phase or voltage sag immediately.

  • The Generator Command: The ATS sends a "Start" signal to the Genset.

  • The Changeover (The "Clack"): Once the generator reaches stable frequency and voltage, the ATS mechanically disconnects from the grid and connects to the emergency bus.

  • The Fan Re-Start: The Variable Frequency Drive (VFD) or Soft-Starter must be programmed to "Auto-Restart" after this power blip. If the VFD stays in "Fault" mode, the fan remains dead.


2. The EKG "Total-Blackout" Testing Protocol

We simulate a real-world power failure to find the "Hidden Faults" in your electrical bypass:

  • Live Load Transfer Test: We don't just test the ATS with a light bulb; we test it while the 75kW Fire Fan is running. This proves the ATS contacts can handle the massive "Inrush Current" during a fast transfer.

  • Phase Rotation Verification: We ensure the Generator's phase sequence matches the TNB grid. If the phases are swapped, your pressurization fans will spin backwards, sucking smoke into the stairs instead of pushing it out.

  • Contact Resistance & Thermal Scan: We use infrared (IR) cameras to check for "Hot Spots" on the ATS terminals. High resistance in a 10-year-old switch can lead to an electrical fire during the heavy load of an emergency.

  • VFD "Ride-Through" Audit: We check the Variable Frequency Drive (VFD) settings. We ensure the "Under-Voltage" protection doesn't permanently lock out the motor during the 5 to 10-second gap before the generator takes over.


3. The Energy & Mechanical Impact: The Cube Law

A "dirty" power transfer with voltage spikes or sags can damage motor windings and VFD capacitors, leading to mechanical friction.

  • Friction Prevention: Repeated "hard starts" caused by poor power quality create internal heat that degrades bearing grease.

  • The Logic: Because of the Cube Law, a motor with healthy, low-friction bearings (protected by clean power transfers) requires less frequency (Hz) to hit its pressure target. Testing the ATS protects the long-term Efficiency ROI of your fan.


4. ATS & Power Changeover Matrix

Test Parameter Target Performance Failure Risk
Transfer Time < 10 seconds Smoke Accumulation in Stairs
Phase Alignment L1-L2-L3 (Matched) Fan Spinning Backwards
Contact Temp < 65^C ATS Meltdown / Fire Risk
Voltage Drop < 10% at Startup VFD Tripping on Under-Voltage
Genset Signal Instant "Dry Contact" Generator Fails to Start

5. Why Trust EKG for Power Changeover Testing?

  • Holistic Mechanical Focus: We bridge the gap between the Electrical (ATS) and the Mechanical (Fan). We ensure the whole "Life Safety Chain" works, not just the switch.

  • BOMBA & FC Readiness: Our testing provides the documented "Success Log" required for your annual Fire Certificate (FC) and Energy Commission (ST) audits.

  • VFD ROI Projection: We ensure your VFDs are tuned to handle power transitions smoothly, preventing expensive "Component Fatigue" and protecting your energy-saving settings.

  • Precision Tools: We use high-speed power quality analyzers to capture the "Millisecond Data" during the transfer, identifying spikes that standard multimeters miss.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us