请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

25-Mar-2026

Office Fresh Air System | High-Performance Ventilation

A modern office fresh air system is the "respiratory system" of a building. In Malaysia’s tropical climate, this system faces a dual challenge: providing enough oxygen to keep occupants alert while stripping out extreme humidity and urban pollutants. At EKG M&E, we move beyond simple "air intake" to engineered Dedicated Outdoor Air Systems (DOAS) that ensure compliance with the 2026 DOSH Industry Code of Practice on IAQ.

By delivering a consistent flow of 10 l/s per person, we eliminate the "3 PM slump" caused by Carbon Dioxide (CO2) buildup and protect the building from mold and structural dampness.


1. Controlled Fresh Air Intake & Dehumidification

In Kuala Lumpur, simply bringing in "fresh" air means bringing in 90% humidity. Our systems are designed to treat this air before it enters the office floor:

  • Pre-Cooling Coils: We drop the temperature of incoming air to condense out moisture. This prevents "Latent Heat" from overloading your main office air conditioning.

  • Positive Building Pressure: We calibrate the system to maintain a slight positive pressure (+5 to +12 Pa). This creates an invisible shield that pushes air out of door gaps, preventing hot, humid, and unfiltered air from leaking into the office.

  • Multi-Stage Filtration: Every intake is equipped with MERV 13 or higher filters to strip out PM2.5 haze and vehicle exhaust from the city streets.


2. Demand-Controlled Ventilation (DCV)

Energy efficiency is a major pillar of the Energy Efficiency and Conservation Act (EECA). We ensure you aren't paying to ventilate empty rooms:

  • CO2 Sensors: We install high-precision sensors in boardrooms and open-plan areas. When occupancy drops, the system automatically scales back.

  • VFD Modulation: We utilize Variable Frequency Drives (VFDs) to control the intake fans. According to the Cube Law of Power, reducing fan speed by just 20% via the VFD can cut the fan's electricity consumption by nearly 50%.

  • Soft-Start Technology: VFDs eliminate the high-current "surge" when large ventilation fans start up, protecting your building's electrical switchgear.


3. Heat & Energy Recovery (ERV/HRV)

To reduce the cost of cooling hot Malaysian air, we utilize Energy Recovery Ventilation (ERV) to "recycle" the cool energy from the air being exhausted:

  • Enthalpy Exchange: An enthalpy wheel transfers both "coolth" and dryness from the outgoing office air to the incoming fresh air.

  • Thermal Efficiency: This process can reduce the total cooling load on your chillers by 20% to 30%, making it a high-scoring strategy for GBI (Green Building Index) or LEED certifications.


4. Mechanical Health & Vibration Diagnostics

Large fresh air fans often run 24/7. To prevent unexpected noise or mechanical failure, we employ Fast Fourier Transform (FFT) Analysis:

  • Vibration Fingerprinting: We monitor the "vibration signature" of the fan motors. We can detect bearing wear or belt misalignment months before a breakdown occurs.

  • Resonance Locking: We program the VFD to "skip" frequencies that cause the intake ductwork to vibrate or "drum," ensuring the office remains a quiet environment for focused work.


Why Optimize Your Fresh Air System?

  • Health & Productivity: Proper oxygenation reduces headaches and respiratory irritation among staff.

  • Compliance: Our designs meet the 2026 DOSH mandates for indoor air quality.

  • Asset Longevity: Controlling humidity prevents mold growth on carpets, ceiling tiles, and sensitive IT equipment.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us