请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Etepox Solution Sdn Bhd
Etepox Solution Sdn Bhd 201101019530 (947663-V)
营业
时间
星期一 - 星期五 9:00 AM - 6:00 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
营业 休息
SSM
60122388020
erictoh855 WeChat QR
WeChat QR

Wechat ID: erictoh855

The Step-by-Step Process of Industrial Floor Coating Installation

16-Jul-2025

Installing an industrial floor coating is more than just applying paint to concrete—it's a systematic, technical process that requires surface preparation, proper materials, and precise application methods. A successful coating installation ensures maximum durability, chemical resistance, and safety performance. Here’s a step-by-step guide to how it’s done:


Step 1: Site Assessment and Floor Inspection

Before any coating is applied, a professional team will inspect the existing floor surface to assess:

  • Surface condition (cracks, spalls, uneven areas)

  • Moisture content

  • Chemical exposure and usage requirements

  • Traffic patterns and load-bearing needs

This determines the best coating system to use and identifies any repairs or surface treatments needed.


Step 2: Surface Preparation

This is the most critical step in ensuring proper adhesion. Preparation methods include:

  • Mechanical grinding or shot blasting to remove old coatings, oils, or surface laitance

  • Crack repairs and joint filling using epoxy mortar or resin

  • Removal of dust, debris, and moisture using vacuum and drying systems

A properly prepared surface should have the right roughness profile (CSP 2–4) to allow the coating to bond securely.


Step 3: Primer Application

A primer coat is applied to improve adhesion between the concrete and the coating system. Some primers also act as moisture barriers, preventing future delamination caused by vapor migration from the substrate.


Step 4: Base Coat or Body Coat

This is the main layer that provides thickness and performance. Depending on the system, it may be an epoxy, polyurethane, or MMA resin. This coat may include:

  • Non-slip additives (silica or quartz)

  • Decorative flakes or color pigments

  • Reinforcement materials for added strength


Step 5: Topcoat Application

A protective topcoat is applied to seal the system, provide abrasion resistance, and enhance appearance. The topcoat also improves chemical resistance and makes cleaning easier. Options include:

  • Glossy, matte, or satin finishes

  • UV-resistant polyurethane topcoats for outdoor use

  • Anti-slip finishes for safety


Step 6: Curing and Final Inspection

The coating must be left to cure, which may take anywhere from 4 hours to 72 hours, depending on the material used. After curing:

  • Final inspection is carried out for surface quality, bonding, and uniformity

  • The floor is handed over for use—often with care guidelines or a maintenance plan


Conclusion

A proper industrial floor coating installation involves planning, preparation, and precision. When done correctly, it results in a high-performance surface that protects your facility, enhances safety, and delivers long-term value.

总办事处

Etepox Solution Sdn Bhd 201101019530 (947663-V)
27-6 & 27-7, Menara Mutiara Central, No. 2, Jalan Desa Aman 1, Cheras Business Centre, 56100 Cheras, Wilayah Persekutuan Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.etepox.com
网址: https://etepox.newpages.com.my/
网址: https://etepox.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • US 14867
  • GB 11760
  • AU 10708
  • CA 10557
  • IE 7118
  • NZ 5068
  • BR 2156
  • IN 1002
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us