Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                24744
BR                                24744                             VN                                11400
VN                                11400                             US                                11041
US                                11041                             IN                                4795
IN                                4795                             AR                                2781
AR                                2781                             GB                                2093
GB                                2093                             MY                                1702
MY                                1702                             MX                                1243
MX                                1243                             
         
        
 
        