Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                22224
BR                                22224                             VN                                11090
VN                                11090                             US                                3750
US                                3750                             AR                                2144
AR                                2144                             CN                                1593
CN                                1593                             IN                                1140
IN                                1140                             MY                                1101
MY                                1101                             EC                                990
EC                                990                             
         
        