Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                36723
BR                                36723                             VN                                12027
VN                                12027                             US                                10022
US                                10022                             IN                                4929
IN                                4929                             AR                                3342
AR                                3342                             GB                                1976
GB                                1976                             MY                                1708
MY                                1708                             EC                                1567
EC                                1567                             
         
        