Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
Green Energy Automation Sdn Bhd
Green Energy Automation Sdn Bhd 201201043627 (1028104-T)
Business
Hours
Monday - Friday 9:00 AM - 6:00 PM
Saturday 9:00 AM - 1:00 PM
Sunday Closed
Open Closed
Onesync AI SSM
60187891859
mychinkee WeChat QR
WeChat QR

Wechat ID: mychinkee

Welding Procedure Process and Method

12-Aug-2025

🔧 How Do I Qualify a Welding Procedure? (WPS Process  Step by Step)

As a mechanical engineer working in pipe manufacturing, qualifying a welding procedure is not just a technical task ¡ª it¡¯s a guarantee of quality and safety.


Here¡¯s how to from a concept to a qualified WPS 👇

.;

1. Start with a pWPS (Preliminary Welding Procedure Specification):

I prepare a draft based on project specs and the applicable standard (e.g., API 5L or ASME IX).

It includes:

" Welding process: SAW / GMAW / SMAW

" Joint type & groove design

" Base metal grade

" Filler wire & flux

" Preheat & interpass temperatures

" Welding positions and passes

" Voltage, amperage, travel speed

.;

2. Perform the Welding Trial:

Using the pWPS, we weld a test coupon under controlled conditions.

All parameters are monitored and recorded carefully.

.;

3. Non-Destructive Testing (NDT):

Before we cut the coupon, we apply:

" Visual Inspection (VT)

" Ultrasonic Testing (UT) or Radiography (RT)

This ensures surface and internal weld soundness.

.;

4. Destructive Testing (DT):

We cut and test the coupon to verify:

" Tensile strength

" Bend test

" Impact test (for PSL 2 or low-temperature service)

" Macro/micro examination

" Hardness test (if required)

.;

5. Issue PQR (Procedure Qualification Record):

If all results meet the code and project requirements, we record them in the PQR, which validates the process.

.;

6. Final WPS Approval:

Based on the PQR, the Welding Procedure Specification (WPS) is issued and approved for production use.

.;

This cycle ensures that every weld meets performance expectations before it even reaches the field.

Main Office

Green Energy Automation Sdn Bhd 201201043627 (1028104-T)
No. 2, Jalan Selatan 3/2, Taman Perindustrian Ringan Pulai, 81300 Skudai, Johor, Malaysia.

Tel:

Email:
Website: https://www.geasb.com
Website: https://geasb.newpages.com.my/
Website: https://geasb.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

  • GB 9355
  • US 9157
  • CA 8722
  • AU 7738
  • IE 5198
  • BR 2233
  • VN 1274
  • NZ 878
People Online
Seni Jaya Logo
Brochure
Download
Our PackageContact Us