AHU - Replacement of Cooling Coil (Johor and Selangor)
Scope of Work:
Site Inspection & Assessment
Conduct detailed inspection of the existing AHU and cooling coil to assess condition, sizing, and replacement requirements.
System Shutdown & Safety Lockout
Safely isolate and shut down the AHU system, following proper Lockout/Tagout (LOTO) procedures to ensure safety during works.
Dismantling of Existing Coil
Remove access panels and carefully disconnect chilled water or refrigerant lines, electrical connections, and supports.
Removal of Damaged Coil
Extract the old or leaking coil with proper handling to avoid damage to surrounding AHU components.
Supply of New Cooling Coil
Provide high-quality replacement coil, custom-fabricated to match AHU model and required specifications (rows, fins, capacity).
Installation of New Coil
Position and secure the new cooling coil in the AHU housing, ensuring correct alignment and support.
Reconnection of Piping & Insulation
Reconnect chilled water/refrigerant pipes with proper brazing or mechanical fittings, and apply new thermal insulation.
Leak & Pressure Testing
Perform leak tests and pressure checks on piping and coil connections to ensure system integrity.
Flushing & Chemical Cleaning (if needed)
Clean chilled water lines and coil internally to remove debris, scale, or contaminants.
System Recommissioning
Start up the AHU system, check flow rates, temperature differential, and airflow. Calibrate controls and thermostats as needed.
Final Testing & Handover
Verify performance under actual load conditions, document readings, and hand over job with test report and warranty (if applicable).