Site Assessment & Planning
Evaluate room layout, load requirements, and ducting paths to determine optimal FCU placement and sizing.
FCU Supply & Delivery
Provide wall-mounted, ceiling cassette, or concealed-type FCUs from trusted brands based on project needs.
Mounting & Structural Works
Secure installation of FCU brackets, supports, and vibration isolators to ensure safe and stable operation.
Piping & Drainage Installation
Install insulated chilled water or refrigerant piping and properly sloped condensate drain lines to prevent leaks.
Electrical Wiring & Control Connection
Complete electrical wiring, control panel setup, and integration with thermostats or building management systems (BMS).
Air Duct & Diffuser Connection (if required)
Install flexible or rigid ducts and connect to supply and return air diffusers for efficient airflow distribution.
Pressure Testing & Insulation
Conduct leak and pressure tests on piping systems and apply insulation to prevent energy loss and condensation.
System Testing & Commissioning
Perform startup procedures, airflow measurement, temperature testing, and calibration of controls.
Handover & User Training
Provide operation manuals, warranty documents, and training for facility staff on basic use and maintenance.
Main Office
KCK Sustainability Solutions Sdn Bhd 202401039757 (1585604-V)
34, Block C, Pusat Perdagangan Ion Medini 4, Persiaran Medini Sentral 5, Iskandar Puteri, 79600 Johor Bahru, Johor, Malaysia.