Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
Mankind Solution Sdn Bhd
Mankind Solution Sdn Bhd 202201019879 (1465576-D)

Landed House Rebuild Cost Malaysia 2025: Complete Breakdown

21-Oct-2025

Landed House Rebuild Cost Malaysia 2025: Complete Breakdown

Quick Facts: Landed House Rebuild 2025

  • Construction cost: RM250-500 per sq ft (Klang Valley)
  • Total budget: RM517K-2.36M depending on size
  • Mankind timeline: 6-12 months (vs industry 18-24 months)
  • Hidden costs add: 35-68% to base construction
  • Rebuild vs Buy: Save 40-60% in PJ, Subang, Bangsar

Source: CIDB Malaysia, The Star 2025

Ceiling leaking after every monsoon? Your 30-year-old terrace telling you it's time?

Every homeowner asks us: "Should I rebuild () or just buy new?"

The answer? If you own land in Petaling Jaya, Subang, or Shah Alam, you're sitting on gold. Anywhere else, the math changes.

 What You'll Actually Pay

For a complete landed house rebuild in Klang Valley: RM250-500 per square foot for construction alone.

Real Example in the market: 2,000 sq ft Double-Storey Terrace
Construction: RM500,000-800,000
Professional fees: RM50,000-80,000
Permits: RM15,000-25,000
Demolition: RM40,000-60,000
Hidden costs: RM80,000-120,000
Total: RM685,000-1,085,000

The 6 Major Cost Components

1. Demolition: RM30-50/sq ft. A 1,600 sf terrace costs RM48,000-80,000.

2. Structure & Foundation: RM200,000-400,000 (40-50% of budget). 2025 prices: concrete RM240-360/cubic meter, steel RM2,200-3,000/tonne.

3. M&E Works: RM80,000-150,000 for electrical, plumbing, air conditioning.

4. Finishes: RM150,000-300,000 for flooring, tiling, painting.

5. Carpentry: RM100,000-200,000. Kitchen cabinets alone: RM3,000-15,000+.

6. Permits & Professional Fees: RM15,000-85,000 for architects, engineers, approvals.

 2025 Reality: Construction costs jumped 30% after June 2024 diesel price hike. Sand prices up 27%. Source: CIDB Malaysia

Hidden Costs That Catch Everyone

Temporary accommodation (9-12 months): RM18,000-27,000 total at RM2,000-3,000/month.

Soil investigation: RM8,000-20,000 upfront, saves RM50,000+ in foundation disasters.

Utilities, insurance, security & hoarding: Another RM15,000-35,000 combined.

Hidden costs add 35-68% to base estimates. Always budget 15-20% contingency.

# Why Mankind Completes in 6-12 Months

Industry standard: 18-24 months. We're faster because of our larger team, LAM-licensed architects, and in-house everything—no waiting for subcontractors.

Phase Industry Mankind
Permits & Approvals 2-4 months 1.5-3 months
Construction 9-18 months 4-8 months
TOTAL 18-24 months 6-12 months

Rebuild vs Buy: The Math

Prime Areas (PJ, Subang, Bangsar, Shah Alam)

Rebuild on owned land: RM517K-962K
Buy equivalent property: RM1.06M-1.61M
You save: 40-60%

CBRE projects Klang Valley prices rising 3-4% in 2025.

Rebuild If You:

  • Own land in established areas
  • Have 15-20% budget buffer
  • Want custom layout
  • Plan 10+ year ownership

Buy Instead If You:

  • Need immediate occupancy
  • Own land in emerging areas (savings only 5-15%)
  • Limited budget flexibility

How Mankind Makes It More Affordable

Our one-stop service since 2017: LAM-licensed design, all permit submissions (DBKL/MBPJ/MBSA/MPSJ), demolition to CCC, direct material sourcing, in-house M&E team.

Payment Structure: 10% deposit 45% before structure completion 45% after structure completion
Pay only for ready work. No 30-40% upfront deposits like other contractors.

Making Your Decision

One Subang client rebuilt for RM780,000. Equivalent properties: RM1.3 million. Instant equity gain: RM520,000.

But beyond numbers, they gained control—custom layout, morning light in the kitchen, space for their growing family.

Ready properties = certainty and speed. Rebuilds = customization and superior returns in prime locations.

Now you know the real 2025 costs and timeline. The choice depends on your location, budget, and what you value more: speed or control.

Get Your Free Rebuild Consultation

Detailed quotation tailored to your property. We'll assess your structure, explain the process, and provide transparent pricing with our 6-12 month guarantee.

Schedule Free Consultation →

Mankind Space Creation
CIDB-registered LAM-licensed architects 8+ years All Klang Valley

Main Office

Mankind Solution Sdn Bhd 202201019879 (1465576-D)
No 93-1 & 93¨C2, Jalan Radin Bagus, Bandar Sri Petaling, 57000 Kuala Lumpur, Malaysia

Tel:

Email:
Website: https://www.mankindspacecreation.com
Website: https://mankindspacecreation.newpages.com.my/
Website: https://mankindspacecreation.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

  • BR 16798
  • VN 6230
  • US 3284
  • CN 1669
  • AR 1492
  • MY 875
  • SG 820
  • EC 791
People Online
Seni Jaya Logo
Brochure
Download
Our PackageContact Us