- HMI Touch Screen Machine process
- SCADA design system for Boiler process
- Fabrications PLC Control Panel
- Fabrications Inverter Control Panel
- Fabrications Machine Control Panel
- Pump Control Panel Installation Soft-starter
- Fabrications Machine Control Panel with Allen Bradley PLC
- Omron PLC with Load Cell Process Weight Control System
- Lay Power Cables
- Install Power Cable Ladder
- Power Cables Termination
- 5000Amp Busduct Installation
- Power Cable Jointed
- MSB Panel Install & FR cable install
- Cable trunking new machine install
- Install Earth with Earth Chamber and Tested
- Install High Bay LED Light for factory
- Cable tray and trunking installation works
- Install New Inverter 250KW



