Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
KenaliTv
KenaliTv 201101032042 (960177-T)
Onesync Platinum SSM
Business Nature:

Services

Over 1 million ships pass through Three Gorge Dam in last two decades - KenaliTv

Over 1 million ships pass through Three Gorge Dam in last two decades

26-Jul-2023

A total of 1 million ships have passed through the Three Gorges Dam since it opened to traffic in June 2003, the Three Gorges Navigation Authority said on Tuesday.

The total cargo throughput via the ship locks exceeded the accumulative amount of 1.936 billion tonnes in the past two decades.

It has significantly boosted the transportation efficiency on the river, providing robust support for the safe and smooth navigation of the Yangtze River.

The Three Gorges ship locks operated 23.13 times daily on average in the beginning phase of the operation and have increased an average of 31 times per day nowadays. Its reliability to pass through the dam hit 93.95 percent, over 10 percent higher than the designed target, which means the dam could operate for about 900 more hours per year than expected.

The Three Gorges project is a multi-functional water-control system consisting of a 2,309-meter-long and 185-meter-high dam, five-tier ship locks on the north and south sides, and 34 turbo-generators with a combined generating capacity of 22.5 million kilowatts.

Main Office

KenaliTv 201101032042 (960177-T)
8th Floor, Wisma Bernama, No 28, Jalan Bernama Off Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia.

Email:
Website: https://www.kenalitv.com
Website: https://kenalitv.newpages.com.my/
Website: https://kenalitv.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

  • BR 27901
  • US 9645
  • AR 3724
  • CN 2554
  • MY 1915
  • DE 1856
  • EC 1763
  • PY 928
People Online
Seni Jaya Logo
Brochure
Download
Our PackageContact Us