Sabah Maju Jaya Signage! Turnkey wall + signage build: masonry wall, ACP cladding and 3D lettering with safe structure and clean finishing. Suitable for government, campuses and corporate frontage. MOQ 1 pc; 1–2 weeks.
þ Wall Construction + Signage Fabrication (Turnkey)
Min. Order
1 pc
Material
Masonry/RC wall, ACP cladding/fascia, 3D acrylic/metal letters
Print / Finish
Powder coated letters / reflective vinyl; optional crest/logo in UV print
Process Time
1–2 weeks
Description
þ Project Gallery (Before → After)
Before — Site Preparation
After — Completed Wall & Signage
Key Features
- End to end: civil works + sign fabrication + install
- ACP cladding with 3D powder coated letters
- Weather ready structure, drainage & waterproofing
- DBKK/landlord compliance guidance
- Clean handover with safety and warranty briefing
Tips
- Share exact wording, logo files (AI/PDF) and brand colours
- Confirm foundation/utility lines before excavation
- Choose high contrast colours for long range legibility
- Consider night visibility: reflective vinyl or lighting
- Schedule maintenance wash down every 6–12 months
Suitable For & Real-Life Examples
Government & Agencies – monuments
- Kota Kinabalu City Hall (DBKK)
- Majlis Perkhidmatan Masyarakat Sabah
- Jabatan Kerja Raya Sabah (JKR) compounds
Education & Healthcare – gateways
- Universiti Malaysia Sabah (UMS)
- Hospital Queen Elizabeth areas
- SMK/SDK campus entrances
Corporate & Property – frontage
- Imago / Suria Sabah tenants
- Industrial parks Kolombong
- Developments in Likas / Penampang
- wall construction signage Sabah
- ACP cladding monument sign KK
- 3D letters powder coated
- DBKK compliance signboard
- government facility frontage
- corporate entrance gateway
- engineering and installation
- site survey and permits
- turnkey build 1–2 weeks
- Sabah signage contractor
Do you handle permits and drawings?
We provide measurement, visuals and compliance guidance. For DBKK or landlord submission, we can assist or coordinate with your consultant as required.
What materials do you use for the sign?
Commonly ACP/ACM cladding on the fascia with 3D acrylic or metal letters, finished with powder coat or reflective vinyl depending on the spec.
What is the typical timeline?
Standard projects complete in 1–2 weeks after approval and site readiness. Weather and scope (foundation, lighting) may affect the schedule.
Can you add lighting or reflective elements?
Yes—options include reflective vinyl, flood lights or back lit letters. We’ll propose based on visibility and budget.