Step 1 provide SIZE wall to wall, for assume price.
Step 2 CONFIRM color & design
Step 3 arrange FULL PAYMENT for the bill
Step 4 service team will arrange to side to take actual measurements
Step 5 after item complete, will arrange installation service
* *it might take 4-5weeks time to complete
Please Take Note
*Delivery & Installation within Klang Valley Only
*Pre Order item within 3 weeks OR more
*NOT available for East Malaysia (Sabah / Sarawak)
*NOT Include Removing Existing Carpets
*Price NOT include hacking and plaster (dismantle work)
* if after delivery can't install will be charge RM150 for next trip install fee
*Cancellation of appointment inform 3 days before if not will be charged RM150
If the site is not ready for measurement, a RM50 transportation fee will be charged for the second visit. Common reasons for needing a second measurement include:
- Incomplete flooring or frame tiling
- Defective door frame
- Unfinished plastering around the door opening
- Unfinished laminate or SPC flooring
Main Office
CHENG HUAT HARDWARE (SENTUL) SDN BHD 201601019501 (1190438-P)
504, Jalan Kampung Bandar Dalam, Sentul, 51100 Kuala Lumpur, Malaysia.