Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Business
Hours
Monday - Friday 9:00 AM - 5:30 PM
Saturday 9:00 AM - 1:00 PM
Sunday Closed
We′re closed on Public Holiday
Open Closed
Onesync AI SSM
VISITORS

12-May-2026

AHU Casing Integrity Testing Post-Rigging

In the 2026 engineering landscape, AHU Casing Integrity Testing is a critical post-rigging requirement. Large Air Handling Units, especially those rigged in sections for high-rise installations, are susceptible to frame distortion or seal compromise during the hoisting and positioning process. Under the Energy Efficiency and Conservation Act (EECA) 2024, any casing leakage is categorized as "Energy Theft," directly impacting the mandatory Building Energy Intensity (BEI) rating.

At EKG (Malaysia) SDN BHD, we perform rigorous integrity testing to ensure every unit remains Sterile, Silent, and Statutory-Compliant after the riggers have left the site.


1. The Engineering Logic of Integrity Testing

The structural integrity of a double-skin AHU casing determines the unit's thermal performance and indoor air quality.

  • Prevention of Air Bypass: Casing leaks allow unconditioned, humid Malaysian air to bypass the cooling coils and filters. This spikes the latent cooling load and introduces contaminants, violating DOSH (JKKP) hygiene standards.

  • Thermal Bridge Verification: Rigging stresses can cause minor gaps in the TB2 Thermal Break gaskets. Testing identifies these gaps before they lead to external "sweating," which causes structural corrosion and mold.

  • Acoustic Containment: A "tight" casing is a silent casing. Leakage points often act as "whistles" or vibration points, making it impossible to achieve the NC 30-35 noise profile required for Grade-A office environments.


2. Technical Testing Protocols (2026 Standards)

We utilize a multi-point testing framework to verify that the rigging process has not compromised the equipment.

Test Method Standard / Tooling Engineering Purpose
Static Pressure Leak Test EN 1886 / SMACNA Pressurizing the casing to verify leakage rates are within Class L1 limits.
Ultrasonic Leak Detection High-Frequency Probes Pinpointing microscopic seal failures in modular joints that are invisible to the eye.
Thermal Imaging (FLIR) Infrared Thermography Detecting "Cold Spots" that indicate a compromise in the thermal break integrity.
Smoke Visualization Non-Toxic Tracer Smoke Visual verification of airtightness at the filter frame and door gaskets.

3. Statutory Compliance (EECA 2024 & MS 1525)

As of January 1, 2026, casing integrity reports are mandatory for the successful handover of any project exceeding RM10 million.

  • Energy Commission (ST) Audit: The Energy Commission now requires proof that the "As-Installed" unit matches its design efficiency. A leaking casing significantly increases Specific Fan Power (SFP), which can lead to non-compliance penalties.

  • BIM Digital Twin (LOD 500): We upload the successful integrity test results directly to the building's Digital Twin. This serves as a "Digital Birth Certificate," proving the unit was handed over in a sterile and efficient state.

  • GITA Compliance: Evidence of post-rigging integrity testing is required to claim the 100% Green Investment Tax Allowance for high-performance HVAC equipment.


4. Why Partner with EKG (Malaysia) SDN BHD?

  • Technical Integrity: Our testing is conducted by mechanical engineers who specialize in the thermodynamics of air containment.

  • Modular Expertise: We specialize in testing modular AHUs that have been assembled on-site, ensuring the field-joints are as airtight as the factory-sealed sections.

  • Zero-Gap Remediation: If a leak is detected, our teams provide immediate on-site remediation, re-sealing gaskets and adjusting frame tensions to restore the unit to peak performance.

Was your AHU rigged for speed or rigged for performance? Contact EKG (Malaysia) SDN BHD today for a specialized AHU Casing Integrity Test post-rigging.

Are you preparing for a mandatory energy audit, or is this for a new Grade-A office handover?

Send your message to EKG M & E SDN BHD
Thank you for your inquiry!
Our Customer Support will be in touch with you shortly.
Your Name *
Your Company Name
Your Email *
Your Contact Number *
Subject *
Message *
Captcha *
Main Office

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Email:
Website: https://www.eakon.com.my
Website: https://eakon.newpages.com.my/
Website: https://eakon.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us