Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Business
Hours
Monday - Friday 9:00 AM - 5:30 PM
Saturday 9:00 AM - 1:00 PM
Sunday Closed
We′re closed on Public Holiday
Open Closed
SSM
VISITORS

24-Mar-2026

Emergency Ventilation System by EKG M&E Sdn Bhd

In the high-density urban developments of KL and PJ, an Emergency Ventilation System is the most critical life-safety component of a building's M&E infrastructure. Unlike standard cooling, these systems are engineered to operate under extreme heat and toxic conditions. EKG M&E Sdn Bhd specializes in the design, installation, and maintenance of emergency airflow solutions that meet strict BOMBA and Uniform Building By-Laws (UBBL) requirements.


Core Functions of Emergency Ventilation

When a fire or gas leak occurs, the emergency ventilation system transitions the building from "Comfort Mode" to "Life-Safety Mode" to achieve three main goals:

  • Toxic Smoke Extraction: High-capacity axial fans remove hot gases and smoke from the fire zone at a rate of 10 Air Changes Per Hour (ACH). This maintains a "Clear Layer" at the floor level, providing visibility for occupants to escape.

  • Stairwell and Lift Lobby Pressurization: The system pumps fresh outdoor air into exit routes to create a Positive Pressure (typically 50 Pa). This acts as a physical shield, ensuring that smoke cannot enter the stairs even when doors are opened during evacuation.

  • Heat Reduction and Flashover Prevention: By venting hot gases at the highest point of an atrium or warehouse, the system prevents "Flashover"—the point where radiant heat causes all surfaces in a room to ignite simultaneously.


Engineering Components for 100% Reliability

  • High-Temperature Rated Motors:

    Our emergency fans are equipped with Class H motors, certified to operate at 250 degrees Celsius for a minimum of 2 hours. This ensures the system does not fail when it is needed most.

  • VFD Fire-Mode Override:

    While we use Variable Frequency Drives (VFDs) for daily energy efficiency, the system features a "Fire-Mode" logic. Upon a signal from the Fire Alarm Panel, the VFD bypasses all motor protection and energy-saving limits to run the fans at 100% capacity immediately.

  • Motorized Fire and Smoke Dampers:

    To prevent the ductwork from becoming a "highway" for smoke, we install motorized dampers that snap shut at fire-rated wall penetrations, isolating the fire zone from the rest of the building.

  • Secondary Power Integration (Genset):

    All emergency ventilation components are wired with fire-rated cabling and connected to the building's backup generator via an Automatic Transfer Switch (ATS).


Compliance and Performance Standards

System Feature UBBL / BOMBA Requirement EKG M&E Standard
Extraction Rate 10 ACH (Smoke Spill). High-Static Axial Performance.
Response Time Full operation within 60 seconds. High-speed motorized actuators.
Pressurization 50 Pa (Stairwells). Calibrated Pressure Mapping.
Testing Annual Professional Validation. Hot Smoke & Airflow Testing.

Why Choose EKG M&E Sdn Bhd?

  • HVAC & Clean Air Specialist: We ensure your emergency system is fully interlocked with your general AC. When "Smoke Mode" activates, the office cooling fans must turn off to prevent the mechanical mixing of toxic gases throughout the floors.

  • Testing and Commissioning (T&C): We provide professional Smoke Visualization Testing and Differential Pressure Audits to ensure your building is ready for its annual Fire Certificate (FC) renewal.

  • Klang Valley Strategic Support: Based in Kuala Lumpur, we provide priority 24/7 maintenance and emergency response for smoke spill systems across the Klang Valley.

Send your message to EKG M & E SDN BHD
Thank you for your inquiry!
Our Customer Support will be in touch with you shortly.
Your Name *
Your Company Name
Your Email *
Your Contact Number *
Subject *
Message *
Captcha *
Main Office

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Email:
Website: https://www.eakon.com.my
Website: https://eakon.newpages.com.my/
Website: https://eakon.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us