Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
PROGAUGE ENTERPRISE
PROGAUGE ENTERPRISE 201603310179 (NS0171749-H)
Business
Hours
Monday - Friday 9:00 AM - 5:00 PM
Saturday - Sunday Closed
We′re closed on Public Holiday
Open Closed

Waste No. 4 - Waste due to Waiting too long

29-Nov-2020

Continuation of 7 Waste of Lean Manufacturing series.

Waste No. 4 - Waste of Waiting

What it is?
  1. It is the act of doing nothing by stood there for long period of time waiting for a previous step in the process.
  2. Operator waiting for the product complete while the machine in running.
  3. Waiting was created by poor machine maintenance.
  4. Waiting existed by long changeover.
  5. Waiting created by unreliable process or many defects.
How you over come it?
 
  1. Improving machine reliability and quality by using Total Productive Maintenance (TPM) and quality tools.
  2. Reducing overproduction and inventory to minimize transport and movement between and within cells.
  3. Develop a standard operating procedure to ensure the process has standardize operating and clear instruction for operation.
  4. Use visual methods of planning to give details of planning work.
  5. Regular daily group meetings to ensure that everyone is clear what is required for the day.
This may help your process to overcome waste of motion, the waste No.4 in Lean manufacturing.

By reducing waiting you will improve the productivity of your workers and reduce your operating costs and eventually increase operating profit margin.

If you have more idea why not drops us in comment - Thanks!
Main Office

PROGAUGE ENTERPRISE 201603310179 (NS0171749-H)
24G, Jalan Dr. Krishan, Bandar Seremban, 70000 Seremban, Negeri Sembilan, Malaysia.

Tel:

Email:
Website: https://www.progaugeenterprise.com
Website: https://progaugeenterprise.newpages.com.my/
Website: https://progaugeenterprise.n.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

  • US 7432
  • GB 7298
  • AU 6747
  • CA 6726
  • IE 4113
  • NZ 3023
  • BR 884
  • CN 860
People Online
Seni Jaya Logo
Brochure
Download
Our PackageContact Us