Product | ||||
Article Number (Market Facing Number) | 6SL3224-0BE35-5AA0 | |||
Product Description | ***spare part*** SINAMICS G120 PM240 Power Module with integrated filter class A with integrated braking chopper 380-480 V 3 AC +10/-10% 47-63 Hz power high overload: 55 kW at 200% 3 s,150% 57 s,100% 240 s ambient temperature -10 to +50 °C power low overload: 75 kW at 150% 3 s,110% 57 s,100% 240 s ambient temperature -10 to +40 °C 934 x 350 x 316 (HxWxD), FSF degree of protection IP20 without Control Unit and BOP | |||
Product family | Not available | |||
Product Lifecycle (PLM) | PM410:Product cancellation | |||
PLM Effective Date | Product is cancelled since: 2019.10.01 | |||
Notes |
Only available as spare part.<br> Please visit the <a href=''https://mall.industry.siemens.com/goos/SpareParts/Pages/default.aspx?currentlang=sv®ionUrl=se&SiepCountryCode=SE#MP#mall id#/MP#''>spare part pages</a> to order, or contact reservdelar.se@siemens.com for help. <br><br>
If you need assistance please contact our local Siemens office
|
|||
Price data | ||||
Region Specific PriceGroup / Headquarter Price Group | 3A2 / 3A2 | |||
List Price | Show prices | |||
Customer Price | Show prices | |||
Metal Factor | None | |||
Delivery information | ||||
Export Control Regulations | ECCN : N / AL : N | |||
Standard lead time ex-works | 1 Day/Days | |||
Net Weight (kg) | 52,000 Kg | |||
Packaging Dimension | 400,00 x 1200,00 x 620,00 | |||
Package size unit of measure | MM | |||
Quantity Unit | 1 Piece | |||
Packaging Quantity | 1 | |||
Additional Product Information | ||||
EAN | 4019169455220 | |||
UPC | 662643434569 | |||
Commodity Code | 85044095 | |||
LKZ_FDB/ CatalogID | D11.1SD | |||
Product Group | 9486 | |||
Group Code | R2S3 | |||
Country of origin | Germany | |||
Compliance with the substance restrictions according to RoHS directive | Since: 2012.03.01 | |||
Product class | C: products manufactured / produced to order, which cannot be reused or re-utilized or be returned against credit. | |||
WEEE (2012/19/EU) Take-Back Obligation | Yes | |||
REACH Art. 33 Duty to inform according to the current list of candidates |
|