- Stainless Steel Pipe (Palm Oil Mill)
- Large Flowmeter Installation
- On-Site Main Switchboard (MSB) modification
- Busbar Modification
- Cable Tray Installation
- Cable Pulling Laying
- Cable Dressing & Cable Termination
- Flow Transmitter Installation & Termination
- Conductivity Sensor Unit (CSU) Installation & Termination
- Temperature Switch Installation & Termination
- Pressure Switch & Gauge Installation
- Fresh Temperature Sensor (FTS) Installation & Termination
- Gas Detection Sensor Installation & Termination
- VRCS and IAS Wiring Modification
- Air Pump Unit Installation & Termination
- Roof & Cladding Installation
- Steam Tracing Installation
- Stainless Steel Pipe Installation ( Water Cooling Air Line & Compress Air Line)
- Material, Tool & Equipment Transportation Delivery Services
- Astralpool Pump Colorado 7.5hp service and spare parts
- Calgon VR 12-30 E Vertical Multistage Pump Service & Repair
- Sludge Pump (TSLP-150) Services & Repair
- Calpeda NM 25/160AE End Suction Threaded Pump 415V Service
- Miltron Roy G Series Dosing Pumps GM0330
- Tsunami Pump HQP-250 Fish Pond Submersible Pump
- OSIP Pump Model ZM 100-B Service and Repair