Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
MTC Engineering Sdn Bhd
MTC Engineering Sdn Bhd 843778-T
Business
Hours
Monday - Thursday 8:00 AM - 6:00 PM
Friday 8:00 AM - 12:00 PM
Saturday - Sunday Closed
We′re closed on Public Holiday
Open Closed

FPSO MTC LEDANG: BULK WATER SEPARATION MODULE INSTALLATION

30-Sep-2019

FPSO MTC LEDANG: BULK WATER SEPARATION MODULE INSTALLATION
 
30th September 2019, Fadhli Omar.
 
MTC Engineering Sdn Bhd (MTCE) announced the arrival of Bulk Water Separation (BWS) module to MMHE Shipyard for installation onboard of the FPSO MTC Ledang on the 20th of September 2019. The BWS module is fabricated in Batam, Indonesia by Influit Production Solutions.

The new module is designed to complement the existing crude stabilisation system to handle produced water production of 14,008 BWPD. Currently, works on integrating the module to the existing system onboard of the FPSO is still ongoing.
 
The installation is part of conversion works on FPSO MTC Ledang for deployment to Jitang Field located approximately 154 km offshore Kemaman Supply Base (KSB), Terengganu. Jitang Field is a part of Irong Cluster PSC development operated by Vestigo Petroleum Sdn Bhd (VPSB). It was discovered by PETRONAS Carigali Sdn Bhd (PCSB) in April 2016 with the drilling of Jitang-1. First oil of the facility is expected to be in Q4 of 2019.
Main Office

MTC Engineering Sdn Bhd 843778-T
2, Jalan Astaka U8/88B, Seksyen U8 Bukit Jelutong, 40150 Shah Alam, Selangor, Malaysia.

Tel:
Fax:

Email:
Website: http://www.mtcgroup.com.my
Website: https://mtcgroup.newpages.com.my/
Website: https://mtcgroup.n.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

  • US 16820
  • GB 11447
  • CA 9087
  • AU 8157
  • BR 6341
  • IE 4897
  • IN 2667
  • NZ 2417
People Online
Seni Jaya Logo
Brochure
Download
Our PackageContact Us