请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Mycropac Solution
Mycropac Solution 202003151060 (IP0540816-M)
Onesync AI SSM

19-May-2026

1. Scope of Works
This method statement outlines the procedure for rectification of water seepage at toilet floor areas through a non-hacking Egel injection waterproofing system beneath existing floor tiles to form a waterproof barrier within the substrate and tile bedding layer.

2. Surface Preparation & Drying Condition
  • Prior to commencement of works, the toilet floor area shall be kept dry for approximately two (2) to three (3) days.
  • All water ponding, moisture exposure, and usage of the toilet shall be avoided during this period.
  • This drying process is essential to allow the gel material to penetrate deeper beneath the existing floor tiles and achieve optimum bonding and waterproofing performance.

3. Drilling Works
  • Mark out the tile joint locations for injection points.
  • Drill approximately 3mm diameter holes along the tile joint areas at suitable intervals based on site conditions.
  • Ensure drilling works are carried out carefully to minimize damage to existing finishes and surrounding tiles.

4. Egel Injection Works
  • Inject the Egel waterproofing material into the drilled holes using a two-component highpressure injection machine.
  • The injected material will flow and spread beneath the floor tile layer through existing voids, capillaries, and porous areas.
  • Within approximately five (5) minutes, the injected material will react and form a flexible elastic gel membrane beneath the tiles.
  • The formed elastic gel acts as a waterproof barrier to seal pores, hairline gaps, and water ingress pathways within the substrate.

5. Surface Cleaning & Making Good
  • Upon completion of injection works, clean off all excess Egel material from the tile surfaceb immediately.
  • Patch and seal all drilled holes using suitable cementitious repair material to match the surrounding tile joint finish.
  • Ensure the completed surface is clean and neat upon completion.

6. Curing & Usage Restriction
  • After completion of the Egel injection system, the treated toilet area shall remain unused for approximately three (3) to four (4) hours.
  • This curing period is required to allow the gel system to fully stabilize and achieve optimum waterproofing performance before exposure to water and normal usage.

7. Final Inspection
  • Conduct final inspection to ensure all injection points are properly sealed and the waterproofing treatment is completed satisfactorily.
  • Any defective or incomplete areas identified during inspection shall be rectified accordingly prior to handover.

Pricing & Warranty
  • Price: RM 1,500 onwards
  • Warranty: 8 Years Warranty on EGEL Waterproofing Treatment*

water proofing
发信息至 Mycropac Solution
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

Mycropac Solution 202003151060 (IP0540816-M)
47, Jalan Mawar, Taman Setia, Sungai Chua, 43000 Kajang, Selangor, Malaysia.

电话:

邮件:

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us